Contact UsCall 0403 584 491

8 Things Adelaide Strata Owners Should Know Before Repainting Their Building

Strata & Multi-Residential

Quick answer

In South Australia, the strata corporation is usually responsible for painting common property, including the building exterior, gutters and roof. Routine maintenance can be approved by a simple majority at a general meeting, but changing the building’s external appearance needs a special resolution. Plan the funding early, write a clear specification, choose the right access method and keep residents informed.

Repainting a strata building is very different from painting a house. There are multiple owners to keep happy, a budget that has to be voted on, rules about what can change, and residents living on site while the work happens.

We’ve painted strata buildings, apartments and townhouse groups across Adelaide, from beachside apartment blocks to CBD buildings. Here’s what owners and committees need to know before the first quote.

01Know who’s responsible for what

Under South Australia’s strata titles rules, the strata corporation is responsible for maintaining common property. In most schemes that includes the building exterior, and the Law Handbook specifically lists gutters and roofs as common property.

Some corporations let owners paint their own unit’s exterior to save money. It’s risky. The Law Handbook notes that the corporation is liable in the first instance for fixing poorly painted paintwork on a unit. One contractor painting the whole building to one specification is usually safer and looks consistent.

Community title schemes can work differently. In some, each owner maintains their own building and the corporation looks after shared areas only. Check your scheme documents.

02Check whether you need a special resolution

It depends on what you’re doing:

  • Like-for-like repaint (same colours): general maintenance. The Law Handbook says this needs a simple majority vote at a general meeting.
  • New colour scheme: changing the external appearance of the units needs a special resolution of the corporation.

AJ Blunt tip

If you’re thinking about a colour change, put two or three colour scheme options (with sample boards or rendered images) to owners before the meeting. It makes the vote faster and avoids a second meeting.

03Plan the funding early

Most corporations pay for repainting from their sinking (or reserve) fund, a special levy, or both. A full exterior repaint is often one of the biggest costs a corporation faces, so it pays to plan ahead.

  • Ask your painter for a condition report and an estimate of when the next repaint is due.
  • Exterior paint on Adelaide buildings typically lasts 7 to 10 years depending on surfaces and exposure. See how long exterior paint lasts on Adelaide homes.
  • Get quotes before your AGM, so the budget and levy can be approved in the same meeting.

04Write a specification before you get quotes

Without a written specification, every painter quotes a different job, and it’s impossible to compare. A good specification lists:

  • every area included (walls, eaves, balconies, balustrades, doors, stairwells, car parks, fences)
  • preparation standards and repairs
  • products, primers and number of coats for each surface
  • colours and sheens
  • access method, working hours and site rules
  • warranty terms

A professional strata painter can help your committee prepare one. Our guide to getting a painting quote explains what a complete quote should include.

05Choose the right access method

Access is often the biggest cost on a strata job after labour. The main options are:

MethodBest forTrade-offs
ScaffoldingLong projects, heavy repairsCostly to hire; blocks light and balconies
Elevated work platform (boom or scissor lift)Low to mid-rise blocks with good ground accessNeeds level, clear ground
Rope access (abseiling)High-rise, tight sites, towersFast set-up, minimal disruption; needs trained painters

Learn more in what does an abseiling painter do?

06Plan for the people living there

Residents stay on site during the work, so communication makes or breaks the project:

  • Give written notice of start dates, and which elevation or block is being done each week.
  • Ask residents to clear balconies and move cars when their area is scheduled.
  • Plan for security (scaffolding near windows), pets, deliveries and working-from-home residents.
  • Set up one point of contact for questions and complaints.

Our preparation checklist can be adapted into a resident notice.

07Don’t skip safety and compliance

Working at height on an occupied building carries real risk. Make sure your painter:

  • holds a current SA building work contractor licence and public liability insurance
  • provides safe work method statements for work at height
  • has trained, ticketed operators for lifts and rope access
  • handles lead paint safely on older blocks. SA Health advises assuming buildings from before the mid-1970s contain lead paint, which includes many of Adelaide’s 1960s and 1970s walk-up unit blocks.

08Protect your investment after the job

A repaint is a 7 to 10 year investment. Protect it with:

  • a written warranty (AJ Blunt provides a 5-year workmanship warranty)
  • a colour and product schedule kept with the corporation’s records, so touch-ups match
  • periodic inspections and wash-downs, especially near the coast
  • quick fixes for leaks and gutters, before water damages the paint

Planning a strata repaint for 2027 or 2028?

We can inspect the building, help your committee with a specification and colour options, and provide a clear quote for your AGM.

Multi-residential and commercial projects we’ve completed

See more on our strata painting and apartment painting pages.

Why strata managers and owners choose AJ Blunt Painting

  • Strata, commercial and aged care experience on occupied sites. See commercial painting and aged care painting.
  • Scaffolding, lifts and rope access, chosen to suit your building and budget.
  • Family-run since 1982, licensed (BLD 21766) and insured.
  • 5-year workmanship warranty on every job.
  • Master Painters Australia award winners, including Master Painters of the Year 2024.

Frequently asked questions

Who pays for painting in a strata building in SA?

Usually the strata corporation, because the exterior, gutters and roof are common property in most schemes. It’s funded through the sinking fund, a special levy, or both. Check your scheme’s documents.

Can I paint the outside of my own strata unit?

Only if your corporation allows it. Changing the external appearance needs a special resolution, and the corporation can end up liable for poor paintwork, so most prefer one contractor for the whole building.

How often should a strata building be repainted?

Typically every 7 to 10 years, depending on surfaces, exposure and the quality of the last job. Coastal and west-facing elevations may need attention sooner.

How long does it take to repaint an apartment building?

It depends on the size, access method and weather. A small walk-up block may take a few weeks. Larger buildings are staged over longer periods. Your painter should give you a written schedule.

Talk to Adelaide’s strata painting specialists

Free inspection and a clear, comparable quote your committee can take to the AGM.

Sources

This article is general information, not legal advice. Check your own scheme’s articles or by-laws, and seek advice for disputes.

About the Author: AJ Blunt Painting Team
AJ Blunt Painting is a family-run Adelaide painting company founded by Tony Blunt in 1982 and now carried on by his sons, Tyron and Zac. As Master Painters Association award winners, our team shares practical advice drawn from over 40 years of residential, heritage, strata and commercial painting across Adelaide.

AJ Blunt Painting | 64 Belair Road, Hawthorn SA 5062 | BLD 21766 | Licensed and insured

Fast Free Quote

Experience seamless, cost-effective and high-quality painting services. Request a quick quote by filling out the form below.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.